loading

If the trial-produced samples require modification, how will the relevant mold costs and modification cycle be handled?

2026-03-31
If the modification is required because we did not meet the mutually confirmed technical specifications, we shall bear all related costs.
If the change is initiated by the customer as a voluntary design revision, we will assess a reasonble and nominal processing fee based on the modification scope, and clearly inform you of the impact on lead time (normally 3–7 working days). All costs and lead times will be confirmed in writing before any modification work starts, with no hidden charges whatsoever.
prev
For overseas projects, what measures do you adopt to guarantee consistent quality for batch production?
In the high-temperature, high-humidity and corrosive environment of a palm oil mill, how do your conveyor chains prevent premature rust and corrosion?
next
Related questions
GET IN TOUCH WITH Us
Send E-Mail If You Need Any Help
Professional Manufacturer of Precision Metal Parts & Conveyor Chains
Contact Us
Tel: 0086 21 56076732
Mobile Phone: 0086 13818971637
Address: 1st Floor, Building 8, No. 868 Xinge Road, Xinqiao Town, Songjiang District, Shanghai, China
Copyright © 2026 | Matech Industry Ltd.  Sitemap
Customer service
detect